Recently, ZILLION signed a contract with the Municipality of Nea Propontida, Halkidiki, following a successful public tender, for the supply and installation of photovoltaic system implementing energy net metering. The project involves the installation of a 1MW system in the area of Nea Potidea. The goal of the project is to cover the Municipality’s energy needs while simultaneously reducing costs and promoting sustainable development.
The works are at an advanced stage and the project is expected to be delivered very soon.
